Blog

Blog2023-11-25T10:02:27+00:00

CSC Screeding were having many screed pump problems, always something breaking down, until now!

May 26th, 2019|Categories: NEW OWNERS, SCREED PUMPS|Tags: , |

CSC were having many Screed Pump problems, always something breaking down, although running some of the latest [...]

Congratulations to Clarke Contracts with new your investment – The new Mörtel Meister Screed Pump with skip and scraper.

May 24th, 2019|Categories: NEW OWNERS, SCREED PUMPS|Tags: |

Clarke Contracts really pleased with the new Mörtel Meister Screed Pump with skip and scraper. Congratulations on [...]

New Concrete Pumps in the UK with Deutz Engines / Low Emission’s – Only 36.6 KW

May 24th, 2019|Categories: ALL NEW MODELS & SPECS, CONCRETE PUMPS|Tags: |

Type: Concrete Pump Engine : Deutz D2011 L03i Diesel Engine 36,6 KW Manual Flow Rate: Min 4m3/h – Max [...]

Mörtel Meister introduces the new MM55 Plastering Machine

May 24th, 2019|Categories: ALL NEW MODELS & SPECS, PLASTERING MACHINES|Tags: |

Description GYPSUM AND CEMENT BASED PRE-MIXED PLASTER MACHINE Pump Efficiency: 6-55 lt. / min Pumping Pressure: avg. 30 bar [...]

Title

Go to Top